Melbourne — our home office
Our head office is in South Yarra and our founding client is a Victorian frame and truss plant. We work under NCC 2025 with the Victorian variations, the Building Practitioners Board categories and the reformed Security of Payment Act every day.
NexGenus in Melbourne — at a glance
- Service area: Melbourne and Victoria.
- What NexGenus provides here: Our head office is in South Yarra and our founding client is a Victorian frame and truss plant. We work under NCC 2025 with the Victorian variations, the Building Practitioners Board categories and the reformed Security of Payment Act every day.
- Building code edition: Victoria adopted NCC 2025 on 1 May 2026, with Victorian variations. Direct-fix cladding is outside the deemed-to-satisfy pathway in climate zones 6–8, which covers all of Victoria — cavity and drainage detailing is now the default and we draw it.
- Registration and sign-off: Building design and drafting are registered under the Victorian Building Practitioners Board categories. The Professional Engineers Registration Act reaches services performed "in or for Victoria, regardless of location", so engineering outside prescriptive solutions is done only under your registered engineer's documented supervision.
- Security of Payment: The Building and Construction Industry Security of Payment Act (Vic) as reformed from 15 April 2026: 20-business-day payment terms, excluded amounts repealed, payment schedule within 10 business days or the claimed amount becomes payable. Our contract administrators track those dates.
- Working hours: Vietnam is three hours behind AEST (two in winter). Melbourne clients get a full working day from 8:30am AEST, and in-person meetings at South Yarra by appointment.

Working to Victoria requirements
Building code edition
Victoria adopted NCC 2025 on 1 May 2026, with Victorian variations. Direct-fix cladding is outside the deemed-to-satisfy pathway in climate zones 6–8, which covers all of Victoria — cavity and drainage detailing is now the default and we draw it.
Registration and sign-off
Building design and drafting are registered under the Victorian Building Practitioners Board categories. The Professional Engineers Registration Act reaches services performed "in or for Victoria, regardless of location", so engineering outside prescriptive solutions is done only under your registered engineer's documented supervision.
Security of Payment
The Building and Construction Industry Security of Payment Act (Vic) as reformed from 15 April 2026: 20-business-day payment terms, excluded amounts repealed, payment schedule within 10 business days or the claimed amount becomes payable. Our contract administrators track those dates.
Outsourced estimating and detailing for Melbourne businesses
Outsourced estimating Melbourne
Whole-of-house and trade take-offs, BOQs and tender pricing for Melbourne builders and subcontractors, in your template and rate library.
EstimatingTruss and wall detailing — plants
Overflow detailing for Victoria frame and truss plants in MiTek, Pryda or Multinail, checked by your senior detailer.
Frame & trussSteel detailing Melbourne
Tekla shop and erection drawings for Melbourne fabricators to AS 4100 and AS/NZS 5131, connection design under your engineer.
Structural steelDrafting services Melbourne
Working drawings and approval documentation under your registered practitioner.
DraftingCladding setout drawings
Hebel and Masterwall setout packs for Melbourne installers.
CladdingContract administration
Claims and payment schedules to the Victoria Security of Payment timelines.
Contract adminMelbourne hours, every day
Vietnam is three hours behind AEST (two in winter). Melbourne clients get a full working day from 8:30am AEST, and in-person meetings at South Yarra by appointment.
Scoping and review meetings are held in your business hours. Australian review and sign-off sits in our Melbourne office.
How to start
- A 20-minute scoping call on Melbourne hours.
- A fixed-fee pilot — one tender, twenty wall panels, one cladding pack or one steel job.
- A dedicated seat on the second engagement, reviewed in Melbourne.
Melbourne questions
Do you understand the Victorian variations to NCC 2025?
Yes. Victoria adopted NCC 2025 on 1 May 2026 with its own variations. We note the edition and variations on every Victorian set.
Can we meet in person?
Yes — South Yarra, by appointment. Australian review and sign-off sits in Melbourne.
How does the Professional Engineers Registration Act affect offshore work?
It reaches services performed in or for Victoria regardless of where they are performed. Every technical deliverable we produce is prepared under the direction of the client's registered practitioner, and anything outside the prescriptive envelope is done under a registered engineer's documented supervision.
What changed with Security of Payment?
From 15 April 2026: 20-business-day payment terms, excluded amounts repealed, payment schedule within 10 business days or the claim becomes payable.
Capacity for Melbourne, on Melbourne hours.
Fixed-fee pilot, named Australian reviewer, a number you can check.